Client: GeoEngineers
Location: Former ASARCO Smelter, Everett, WA

Environmental Support


The scope of this multi-year environmental EPA Superfund project included the drilling and installation of hundreds of groundwater monitoring wells. Hollow stem auger was used to drill, sample and install a series of both shallow and deep groundwater monitoring wells to be used in conjunction with clean-up and remediation planning activities. The scope included both Upland and Lowland drilling locations and subsequent residential and commercial properties located adjacent to the former ASARCO Smelter Site.