Client: McClure & Sons
Location: Everett, Washington
Dewatering Support
Work on this project included the installation of a vacuum well point dewatering system along 185 feet of excavation alignment. A series of 2” vacuum well points were installed to depths of 20 feet and then attached to a 12” Thompson rotary vacuum pump to support excavation operations below the water tables of each area.