Client: IMCO General Construction
Location: Van Zant, Washington

Dewatering Support


Work on this project included the drilling and installation of 23 well points and vacuum dewatering system in support of the Tawes Creek fish passage installation.  A series of 2” vacuum well points were installed to depths of 25 feet and then attached to a 12” Thompson rotary vacuum pump.