Location: Greenlake, Seattle, WA

Environmental Support


This multi-phase project was for the installation and thermal treatment of a chlorinated site. Hollow stem auger was used to drill and install electrodes for electric resistive heating (ERH) treatment of PCE source area and direct push probe was used for the installation of Temperature Monitoring Points (TMP’s). Scope was completed safely, under budget and ahead of schedule. Phase II involved direct push probe sampling of the still hot treatment area for conformational soil samples. Hot sampling protocols were required for handling samples and to protect from thermal burns from steam venting.